Loading..

McWay's Bridge Project

mahi_river2

Mahi River

Construction of Submrsible major bridge across river mahi on Santrampur-kadana-dungarpur road Km. 14/00 to 15/00.

mahi_river1

CHANASMA-PATAN-DEESA FLYOVER

CHANASMA-PATAN-DEESA FLYOVER

List of Consultancy Projects of Bridge
Sr.No. Name of Work Project Cost Consultancy Fees Client Location
1 PROVIDING CONSULTANCY SERVICES FOR PREPARATION OF DETAILED DESIGN DRAWING AND ESTIMATE OF BRIDGE ON RIVER DHAMANI AT BORDI ON TALOD-BORDI ROAD ON KM 4/271 . TA.:BAYAD, DIST.:ARAVALLI. (LENGTH OF BRIDGE 70 MT) Rs. 5,44,15,400.00 /- Rs. 5,22,388.00 /- EXECUTIVE ENGINEER, ROAD AND BUILDING DIVISION, MODASA MODASA, GUJARAT
2 CONSULTANCY SERVICE FOR PREPARATION OF MASTER PLAN AND DETAILED ESTIMATES WITH DETAIL DRAWING FOR CHANASMA – PATAN – DEESA FLYOVER MAJOR BRIDGE. (4- LANE) ROAD (SH-07 KM 91 /0 TO 92/0). Rs.27,98,25,600.00 /- Rs. 23,01,000.00 /- EXECUTIVE ENGINEER, ROAD AND BUILDING DIVISION, PATAN PATAN, GUJARAT
3 PROJECT CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY REPORT, SURVEY WORK, PREPARATION OF DETAIL ESTIMATE, DESIGN OF ROAD CRUST & DESIGN OF STRUCTURE & DPR FOR THE   CONSTRUCTION OF FLYOVER BRIDGE ON AHMEDABAD MEHSANA PALANPUR ROAD SH-41 KM (4-LANE) 108/200 TO 108/705 (DETHLI CROSS ROAD) Rs. 35,98,99,000.00 /- Rs.19,50,000.00 /- EXECUTIVE ENGINEER, ROAD AND BUILDING DIVISION, PATAN PATAN, GUJARAT
4 CONSULTANCY SERVICE FOR PREPARATION OF DETAIL PROJECT REPORT, GAD AND DETAILED ESTIMATES WITH DETAIL DRAWING FOR WIDENING OF BRIDGE ON SUJLAM SUFLAM CANAL AT CH. 49+600 ON PATAN SIDDHPUR ROAD Rs.5,50,000.00 /- EXECUTIVE ENGINEER, ROAD AND BUILDING DIVISION, PATAN PATAN, GUJARAT
5 CONSULTANCY SERVICE FOR PREPARATION OF DETAILED PROJECT REPORT, GAD AND DETAILED ESTIMATES WITH DETAIL DRAWING FOR  CONSTRUCTION OF BRIDGE AT CH-48+900 ON SUJALAM-SUFLAM CANAL ON PATAN – UNJHA ROAD UNDER C.R.F.2017-18 Rs.5,50,000.00 /- EXECUTIVE ENGINEER, ROAD AND BUILDING DIVISION, PATAN PATAN, GUJARAT
6 SURVEY/INVESTIGATION AND PREPARATION OF DPR FOR CONSTRUCTION OF NEW MINOR BRIDGES IN PLACE OF OLD NARROW BRIDGE IN KM 201.010 OF NH-327E IN THE STATE OF BIHAR FOR THE YEAR 2021-22. Rs.9,78,900.00 /- EXECUTIVE ENGINEER NH DIVISION MADHEPURA MADHEPURA, BIHAR
7 SURVEY/INVESTIGATION AND PREPARATION OF DPR FOR CONSTRUCTION OF NEW MINOR BRIDGES IN PLACE OF OLD NARROW BRIDGE IN KM 205.500 OF NH-327E IN THE STATE OF BIHAR FOR THE YEAR 2021-22 EXECUTIVE ENGINEER NH DIVISION MADHEPURA MADHEPURA, BIHAR
8 SURVEY/INVESTIGATION AND PREPARATION OF DPR FOR CONSTRUCTION OF NEW MINOR BRIDGES IN PLACE OF OLD NARROW BRIDGE IN KM 206.800 OF NH-327E IN THE STATE OF BIHAR FOR THE YEAR 2021-22 EXECUTIVE ENGINEER NH DIVISION MADHEPURA MADHEPURA, BIHAR
9 PROPOSAL FOR PROJECT MANAGEMENT CONSULTANCY FOR THE WORK OF CONSTRUCTION, WIDENING AND STRENGTHENING OF VARIOUS RIVER BRIDGE ON RAJKOT BHAVNAGAR ROAD (CH. 100/500 TO 101/00, 118/8 TO 119/0, 119/0 TO 119/2, 124/2 TO 124/4 – PACKAGE NO. 1 Rs.26,62,45,155.00 /- Rs.3,98,931.000 /- EXECUTIVE ENGINEER BHAVNAGAR R & B DIVISION BHAVNAGAR BHAVNAGAR, GUJARAT
10 PROPOSAL FOR PROJECT MANAGEMENT CONSULTANCY FOR THE WORK OF CONSTRUCTION OF BRIDGE ACROSS RIVER MALAN ON MAHUVA – MAHUVA PORT ROAD  – CH. 1/0 TO 1/2 (SURVEY WORK FOR MISSING LINK OF MAHUVA – MAHUVA PORT ROAD TO VILLAGE BUNDER, PORT AND FOR BRIDGE ACROSS RIVER MALAN Rs.4,16,90,779.00 /- Rs.31,96,823.00 /- EXECUTIVE ENGINEER BHAVNAGAR R & B DIVISION BHAVNAGAR BHAVNAGAR, GUJARAT
11 CONSULTANCY SERVICES FOR TECHNICAL AUDIT AND QUALITY ASSURANCE AND SAFETY AUDIT THROUGH A QUALIFIED AND EXPERIENCED ROAD SAFETY AUDITOR AS PER IRC / MORTH GUIDELINES AND SUBMISSION OF REPORT WITH COST EFFECTIVE MEASURES AND ITS ESTIMATE OF THE WORK OF CONSTRUCTION OF MAJOR BRIDGE ACROSS AMBIKA RIVER ON MAHUVA-ANAVAL ROAD CH.20/00 TO 20/400 TAL.MAHUVA,DIST.SURAT. Rs.27, 81,56,000.00 /- Rs.7,96,000.00 /- EE SURAT R & B DN2, SURAT SURAT, GUJARAT
12 PROVIDING CONSULTANCY SERVICES FOR THIRD PARTY INSPECTION & QUALITY ASSURANCE FOR THE WORK OF (1) CONSTRUCTION OF HIGH LEVEL BRIDGE A/C RIVER “VADI-THEBI” ON AMRELI FATEPUR ROAD (M.D.R.) K.M. 1/0-2 (2) CONSTRUCTION OF HIGH LEVEL SUBMERSIBLE BRIDGE IN PLACE OF EXISTING BRIDGE ON KAREN RIVER AT K.M. 14/6 TO 14/8 ON AMRELI SAVARKUNDLA RAJULA ROAD. S.H. 34 IN TAL. AMRELI. DIST. AMRELI. Rs.5,30,000.00 /- Rs.7,33,900.00 /- EXECUTIVE ENGINEER R & B DIVISION AMRELI AMRELI, GUJARAT
13 CONSULTANCY SERVICES FOR TECHNICAL AUDIT AND QUALITY ASSURANCE AND CARRYING OUT THE SAFETY AUDIT AS PER IRC MORTH GUIDELINES FOR THE WORK OF CONSTRUCTION OF ROB AT L.C NO. 158-B (RLY KM 290/6-B) (DFCC CH.8333.464) BETWEEN STATIONS KOSAMBA & KIM DIST.SURAT Rs.53,23,04,000.00 /- Rs.15,50,000.000 /- EE SURAT R & B DN2, SURAT SURAT, GUJARAT
14 CONSULTANCY SERVICES FOR TECHNICAL AUDIT AND QUALITY ASSURANCE AND CARRYING OUT THE SAFETY AUDIT AS PER IRC MORTH GUIDELINES FOR THE WORK OF CONSTRUCTION OF NEW FOUR LANE BY PASS BRIDGE WITH APPROACHES AT SENA KHADI, DISMANTLING EXISTING BRIDGE AND CONSTRUCTING NEW FOUR LANE BRIDGE WITH APPROACHES AT TAKARMA KHADI & WIDENING OF BRIDGE WITH APPROACHES AT MASMA KHADI ON SURAT- OLPAD -SAHOL ROAD BETWEEN CH:9/80 TO 29/20, DIST: SURAT Rs 36,97,62.000 /- Rs.10,32,310.00 /- EE SURAT R & B DN2, SURAT SURAT, GUJARAT
15 PROVIDING CONSULTANCY SERVICES FOR THIRD PARTY INSPECTION QUALITY ASSURANCE AND TECHNICAL AUDIT (QATA) FOR DISTRICT R AND B PANCHAYAT DIVISION NADIAD IN THE STATE OF GUJARAT. (CONSTRUCTION OF HIGH LEVEL SUB MARSIBILE BRIDGE ON MAHOR RIVER ON KARARUPUR MINAVADA ROAD AT KAPARUPUR TA MAHUDHA DIST – KHEDA) Rs.3,66,300.00 /- EE PANCHAYAT R & B, NADIAD NADIAD, GUJARAT
16 PROVIDING CONSULTANCY SERVICES FOR THIRD PARTY INSPECTION QUALITY ASSURANCE AND TECHNICAL AUDIT (QATA) FOR DISTRICT R AND B PANCHAYAT DIVISION NADIAD IN THE STATE OF GUJARAT. (CONSTRUCTION OF MAJOR BRIDGE ON SHEDHI RIVER ON SODHPUR KHALADI ROAD AT MAHUDHA TA MAHUDHA DIST – KHEDA) Rs.3,66,300.00 /- EE PANCHA-YAT R & B, NADIAD NADIAD, GUJARAT
17 VATRAK RIVER BRIDGE – AMADAVAD MEHMEDAVAD (NAINPUR CHOKDI TO KHATRAJ CHOKADI) ROAD. KM. 25/00 TO 30/150 S.H. 3 ( NEW MAJOR BRIDGE ACROSS VATRAK RIVER, REPAIRING TO EXITING BRIDGE , PROTECTIVE WORK & MISCELLIOUS WORK.) EXECUTIVE ENGINEER                         R & B DIVISION   NADIAD NADIAD, GUJARAT
18 MAHOR RIVER BRIDGE – CONSTRUCTION OF MAJOR BRIDGE ACROSS RIVER MAHOR ON KM. 37/900 TO 38/100. DIST – KHEDA. ( MAJOR BRIDGE & APPROCHES ACROSS MAHOR RIVER, REPAIRING TO EXITING BRIDGE , PROTECTIVE WORK & MISCELLIOUS WORK.) EXECUTIVE ENGINEER                         R & B DIVISION   NADIAD NADIAD, GUJARAT
19 PROVIDING  CONSULTANCY SERVICES FOR QUALITY ASSURANCE AND TECHNICAL AND CARRYING OUT THE SAFETY AUDIT AS PER IRC MORTH GUIDELINE FOR THE WORK OF CONSTRUCTION OF A HIGH LEVEL BRIDGE IN PLACE OF EXISTING NERO BRIDGE ON UNAI-BUHARI-MADHI-MANDVI-ZAKHVAD ROAD (E.S.H.NO.-5)ON GUNVANTI RIVER KM 129/200 TO 129/400,DIST-SURAT EE SURAT R & B DN2, SURAT SURAT, GUJARAT